General Information

Project type:

PPA (Power Purchase Agreement)

Time:

2026

Capacity:
CO2 Reduction:

4,000 Tons CO2/year Calculated using the 2021 Vietnam grid emission factor

Location:
3,39 MWp, PPA installation project in Vinamilk Mega, Binh Duong
3,39 MWp, PPA installation project in Vinamilk Mega, Binh Duong

Project Details

Main Equipment

About the Project

Solar power system with a capacity of 3,39 MWp was installed at Vietnam Dairy Factory – the most modern mega factory in Vietnam and the area, with the most modern integrated and automatic technology in the world. The system was developed by TotalEnergies and Vu Phong Energy Group is the

General Contractor (EPC)

Solar energy at Vinamilk’s mega dairy factory

Vu Phong Energy Group cooperate with Vinamilk in sustainable development

Vu Phong Energy Group cooperates to implement rooftop solar power system of Dong A Plastic Group