Project details
Main equipment
About the project
Lac Long is a leading manufacturer of pedicure spa chairs for the Nail Spa Industry in Vietnam. With a commitment to green production and environmental protection, the company has partnered with Vu Phong Energy Group to implement a solar power installation project of 1 MWp in GreenTG.
Solar power installation project 1 MWp in Lac Long
This project is based on the PPA (Power Purchase Agreement) model, which allows Lac Long to enjoy clean and affordable electricity from solar energy without any upfront investment. The project was completed in 2020 and is located in Chau Thanh, Tien Giang province. It consists of 2,240 high-efficiency solar panels LG 450Wp and 8 SMA 110KW grid-tie inverters.
- 1 MWp, PPA – O&M solar power installation project in Binh Duong
- 1 MWp, PPA – O&M solar power installation project in Vinamilk, Binh Duong
- 3,39 MWp, PPA solar power installation project in Vinamilk Mega, Binh Duong
The auxiliary frame system and conductor are of high quality and durability, ensuring the optimal performance and longevity of the system. By installing this solar power system, Lac Long has reduced its dependence on fossil fuels and its carbon footprint, while saving on electricity costs and enhancing its brand image as a responsible and sustainable business.
Vu Phong Energy Group