About the Project
The 1.23 MWp solar power system at Tetra Pak’s beverage carton manufacturing factory in Binh Duong was placed into service, after 6 months of development. Tetra Pak self-invested in this project, with BayWa r.e. as the EPC contractor and Vu Phong Energy Group as the construction contractor providing operation and maintenance (O&M) services.