General Information

Project type:

EPC

Time:

2026

Capacity:
CO2 Reduction:

1,450 Tons CO2/year Calculated using the 2021 Vietnam grid emission factor

Location:
Tetra-Pak

Project Details

Main Equipment

About the Project

The 1.23 MWp solar power system at Tetra Pak’s beverage carton manufacturing factory in Binh Duong was placed into service, after 6 months of development. Tetra Pak self-invested in this project, with BayWa r.e. as the EPC contractor and Vu Phong Energy Group as the construction contractor providing operation and maintenance (O&M) services.