General Information

Project type:

BLT (Build-Lease-Transfer)

Date:

2020

Power:

3000 kWp

Address:

Dau Tieng, Binh Duong

3000-kwp-blt-om-hoa-nang-greenhouse-binh-duong
3000-kwp-blt-om-hoa-nang-greenhouse-binh-duong

Project details

Main equipment

6,804 high-efficiency solar panels LG 450Wp
42 ARM Solar 60kW grid-tie inverters
High-quality auxiliary frame system and conductor with over 30 years of durability

About the project

Vu Phong Energy Group implemented the 3000 kWp rooftop solar system for mushroom farm in Dau Tieng, Binh Duong. The investor will plant mushrooms below, and solar panels will be installed on the roof. The double profit model has been used in many nations across the world and is increasingly developing in Vietnam.

This is a farm model for farming (growing food crops, fruit trees,.. or raising animals and poultry…), with solar panels put above to create clean power, service the farm, and sell electricity to the grid to enhance money.