General Information

Project type:

PPA (Power Purchase Agreement)

Date:

2022

Power:

3,39 MWp

Address:

Ben Cat, Binh Duong

3,39 MWp, PPA installation project in Vinamilk Mega, Binh Duong

Project details

Main equipment

7542 high-efficiency solar panels Longi
27 SMA 110KW grid-tie inverters
High-quality auxiliary frame system and conductor with over 30 years of durability

About the project

Solar power system with a capacity of 3,39 MWp was installed at Vietnam Dairy Factory – the most modern mega factory in Vietnam and the area, with the most modern integrated and automatic technology in the world. The system was developed by TotalEnergies and Vu Phong Energy Group is the General Contractor (EPC).

This is one of the most recent solar power systems installed in the beverage processing plant chain and Vinamilk’s dairy foods. The installation of solar panels at factories and Vinamilk’s dairy farm is part of Vinamilk’s green and renewable energy solutions, which are in line with Vinamilk’s sustainable development strategy to contribute to global climate change mitigation.

Vu Phong Energy Group

Read more: