About the project
Vu Phong Energy Group is proud to introduce our project of building a part of the largest solar power plant in Vietnam, located in Dau Tieng Lake, Tay Ninh province. This project has a total capacity of 420 MWp and covers an area of nearly 500 hectares on the semi-flooded land of the lake. The project cost is more than VND 9,000 billion and it started in 2018.
The solar power plant project 420 MWp in Dau Tieng
The Dau Tieng solar power plant is expected to generate about 688 million kWh of electricity per year, contributing to the national grid and reducing greenhouse gas emissions. Vu Phong Energy Group is committed to delivering high-quality and sustainable solutions for renewable energy development in Vietnam.
We have overcome many challenges during the construction process, such as the rising water level caused by the recent typhoon No.9, and we are confident that we will complete the project on time and with excellent results.
Vu Phong Energy Group