14 years
of development, pioneering in the field of clean energy
700+ MWp
has been and is under construction
1000+
completed projects
REQUIREMENTS FOR EMISSIONS REDUCTION - SUSTAINABLE DEVELOPMENT

- The European Union’s Carbon Border Adjustment Mechanism (CBAM) has officially entered its transition phase (October 1, 2023, to December 31, 2025)
- Iron & Steel is one of the first six sectors to be impacted by the CBAM during the first phase, including Cement, Iron and Steel, Aluminium, Fertilizers, Hydrogen, and Electricity.
- In the transition phase, importers must report the amount of goods affected by CBAM and the corresponding emissions, including direct and indirect emissions (from electricity consumption in production).
- In addition to the CBAM mechanism, there are several other mechanisms and policies related to emission reduction and sustainable development, such as the draft Clean Competition Act (CCA) in the United States; the Corporate Sustainability Reporting Directive (CSRD) of the EU; green standards in new-generation FTAs…”
Noticeable, Vietnam steel sector:
- The average emission are approximately 2.51 tons of CO2 per ton of raw steel (compared to the global average of 1.85 tons of CO2 per ton of raw steel).*
- An average electricity consumption of about 400-600 kWh per ton of steel, the amount of emissions from electricity consumed if taken from the national grid for 1,000 tons of steel emissions can reach approximately 288-433 tCO2.
* Data from Energy Conservation Research and Development Center – ENERTEAM
CLEAN ENERGY SOLUTIONS,
EMISSION REDUCTION FOR IRON AND STEEL ENTERPRISES
POWER PURCHASE AGREEMENT (PPA)
COLLABORATION MODEL
Businesses only need an idle roof, no investment costs, and no system operation expenses.
- Vu Phong Energy Group proactively invest, develop, operate and maintain the system
- Businesses can purchase electricity at a reasonable cost for up to 20 years
EPC GENERAL CONTRACTOR
AND O&M SERVICES
Businesses self-invest in the system, and Vu Phong Energy Group accompanies development and operations.
- Professional EPC service ensures a high-quality and aesthetically pleasing system
- High-quality O&M service helps maintain stable system operation and optimize performance
COOPERATION MODEL POWER PURCHASE AGREEMENT
Vu Phong Energy Group's service is dedicated to businesses that are ``greening`` production, towards sustainable development, with many benefits:
- Utilize sustainable energy without spending funds by utilizing the factory’s unused roof
- Actively reduce energy costs
- Long-term contracts that restrict energy price risks
- There is no need to worry about system operation and maintenance
- Comply with green certification and global environmental standards
- Corporate social responsibility for brand


In particular, Vũ Phong Energy Group will collaborate with businesses in the process of applying for International Renewable Energy Certificates (I-REC) through our subsidiary, VP Carbon. Owning I-REC certificates will help businesses meet international requirements for demonstrating the use of renewable energy.
2,17 MWp, PPA Duy Tan Plastics , Binh Duong
General Information Project type:PPA (Power Purchase Agreement) Date:2023 Power:2,17 MWp CO2 Reduction: 2,550 Tons CO2/year Calculated using the 2021 Vietnam grid emission factor Address:Ben Cat, Binh Duong Project detailsMain equipment 3,289 high-efficiency solar panels 16 Inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project The rooftop solar power system at Duy Tan Plastics's factory [...]
8,19 MWp, PPA Golden Victory, Nam Dinh
General Information Project type:PPA (Power Purchase Agreement) Date:2021 & 2023 Power:8,19 MWp CO2 Reduction: 7,100 Tons CO2/year Calculated using the 2021 Vietnam grid emission factor Address:Nghia Hung, Nam Dinh Project detailsMain equipment 14,488 high-efficiency solar panels 60 Inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project The rooftop solar energy project at Vietnam Golden [...]
1.23MWp, Tetra Pak, Binh Duong
General Information Project type:EPC Date:2023 Power:1.23 MWp CO2 Reduction: 1,450 Tons CO2/year Calculated using the 2021 Vietnam grid emission factor Address:Binh Duong Project detailsMain equipment 2272 high-efficiency solar panels JA Solar 540W 10 Huawei 100kW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project The 1.23 MWp solar power system at Tetra Pak’s [...]
1MWp, EPC Vietnam Nippon Seiki, Ha Noi
General Information Project type:EPC Date:2023 Power:1MWp CO2 Reduction: 850 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Soc Son, Ha Noi Project detailsMain equipment 1667 high-efficiency solar panels Canadian 600Wp 8 SMA Sunny Tripower CORE 2 110KW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project Vu Phong Energy [...]
2.23MWp,Kem Nghia/Nghia Nippers Corporation, Cu Chi
General Information Project type:PPA Date:2023 Power:2.23 MWp CO2 Reduction: 2,650 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Cu Chi Project detailsMain equipment 3720 high-efficiency solar panels Canadian 600Wp 16 SMA 100kW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project The rooftop solar power system at Kem Nghia [...]
1 MWp, EPC Mam Nang, Ninh Thuan
General Information Project type:EPC Date:2019 Power:1 MWp CO2 Reduction: 1,300 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Thuan Nam, Ninh Thuan Project detailsMain equipment 2820 high-efficiency solar panels LG 16 ARMSolar 60 KW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project Solar power is a renewable, clean [...]
3MWp,EPC – O&M Hoa Nang, Thai Duong, Ho Bao Anh, Binh Duong
General Information Project type:EPC Date:2020 Power:3 MWp CO2 Reduction: 3,000 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Dau Tieng, Binh Duong Project detailsMain equipment 6,804 high-efficiency solar panels LG 450Wp 42 ARM Solar 60kW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project Solar power is a renewable, [...]
2.04 MWp, PPA Dalat Worsted Spinning DWS, Lam Dong
General Information Project type:PPA (Power Purchase Agreement) Date:2022 Power:2,04 MWp CO2 Reduction: 2,700 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Da Lat, Lam Dong Project detailsMain equipment 3456 high-efficiency solar panels Canadian 590Wp 16 SMA 110KW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project Vu Phong Energy [...]
3.39 MWp, PPA Vinamilk Mega, Binh Duong
General Information Project type:PPA (Power Purchase Agreement) Date:2022 Power:3,39 MWp CO2 Reduction: 4,000 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Ben Cat, Binh Duong Project detailsMain equipment 7542 high-efficiency solar panels Longi 27 SMA 110KW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of durabilityAbout the project Solar power system with [...]
2,22 MWp, PPA Kim Duc, Long An
General Information Project type:PPA (Power Purchase Agreement) Date:2021 Power:2,22 MWp CO2 Reduction: 2,600 Tons CO2/year ( Calculated using the 2021 Vietnam grid emission factor ) Address:Ben Luc, Long An Project detailsMain equipment 4937 high-efficiency solar panels LONGi 450Wp 8 SMA 110KW grid-tie inverters + 13 SMA 75kW grid-tie inverters High-quality auxiliary frame system and conductor with over 30 years of [...]



OUR AWARDS
2022

BEST C&I PROJECT AWARD:
ROOFTOP (INDUSTRIAL)
South East AsiaLeadership Awards

ACHIEVING ZERO RECORDABLE INCIDENT
THROUGHOUT PROJECTS IN 2022
TotalEnergies

2022 BEST EPC CONTRACTOR
IN VIETNAM
TotalEnergies
2021

THE SOLAR FUTURE AWARDS
THE EPC COMPANY OF THE YEAR
THE ASIAN POWER AWARDS
SOLAR POWER PROJECT OF THE YEAR
ENVIRONMENTAL UPGRADE OF THE YEAR

Get professional consultation for your industry.
NO INVESTMENT COSTS - NO OPERATION COSTS
GREEN PRODUCTION - SUSTAINABLE DEVELOPMENT
Towards sustainable development and a strong Vietnam vision of 2045,
Vu Phong Energy Group pursues values in the direction
of United Nations Sustainable Development Goals (SDGs)